CAERI, Chongqing, China

Aeroacoustic wind tunnel for the first wind tunnel center in Southwest China

Project Facts

Year
2015

Duration
4 years

Competencies
Turnkey engineering

Technical data:

  • Max. speed: 230 km/h
  • Nozzle size: 28 m²
  • Test section length: 17 m
  • 5-belt-system
  • Fan capacity: 4210 kW
  • Fan diameter: 9 m

Innovations and special features:

  • Optimal workflow for two wind tunnels
  • The first competitive wind tunnel center in South-West China
  • Modern design, embedded in traditional architecture