CAERI, Chongqing, China
Aeroacoustic wind tunnel for the first wind tunnel center in Southwest China
Project Facts
Year
2015
Duration
4 years
Competencies
Turnkey engineering
Technical data:
- Max. speed: 230 km/h
- Nozzle size: 28 m²
- Test section length: 17 m
- 5-belt-system
- Fan capacity: 4210 kW
- Fan diameter: 9 m
Innovations and special features:
- Optimal workflow for two wind tunnels
- The first competitive wind tunnel center in South-West China
- Modern design, embedded in traditional architecture